Getting ready for the move

| | Comments (0)

I am in the final stages of testing the move of my blog from a TI server to a hosted package with blacknight solutions in Carlow. Hopefully the transition will be smooth, irishsilicon may be unavailable for 36 hrs when I do the transition. The end of feb or the 1st week of march is the most likely date.

Leave a comment

About this Entry

This page contains a single entry by liam noonan published on February 5, 2008 12:20 PM.

Moving all my Movable Type 3.2 feeds to feedburner was the previous entry in this blog.

Converting from Irish Grid (WGS84) to Lat Long is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Influenced by:

Irish Eyes
Jabit
Mike Maunsell
Buzzblog
Tom Raftery I.T. views
Damien Mulley
James Corbett (Eirepeneur)
Powered by Movable Type 4.12