Lisheen mines Wind farm - a feat of engineering

| | Comments (0)




The SWS constructed wind farm at lisheen mines near templetouhy in co, Tipperary in an impressive feat of engineering. The turbines are expected to come online later in 2009. These Vestats V90 turbines are taller than the spire in O;Connel street in Dublin and are rated at 3 Mega Watts each. There will be 18 in total.

Leave a comment

About this Entry

This page contains a single entry by liam noonan published on March 27, 2009 3:39 PM.

The DIY approach to affordable Log Gasifying Boilers was the previous entry in this blog.

Wind Turbine Features - What to consider is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Influenced by:

Irish Eyes
Jabit
Mike Maunsell
Buzzblog
Tom Raftery I.T. views
Damien Mulley
James Corbett (Eirepeneur)
Powered by Movable Type 4.12